Things Stuff Times / Alan's Gallery / 2006 - Ann Arbor / Chamber Construction / Chamber Assembly

Chamber Assembly

IMG_7475.JPG
IMG_7650.JPG
IMG_7653.JPG
IMG_7656.JPG
IMG_7664.JPG
IMG_7665.JPG
IMG_7672.JPG
IMG_7677.JPG
IMG_7679.JPG
IMG_7686.JPG
IMG_7688.JPG
IMG_7692.JPG
IMG_7696.JPG
IMG_7699.JPG
IMG_7701.JPG

After gluing the tubes together into multilayers we need to assemble all the auxillary hardware. This includes the system for feeding gas through each of the tubes, cards for transmitting high voltage to the wires, cards for reading out the signal on the wires, and metal covers for everything which provide structural and electrical protection. Finally we need to glue each multilayer to a frame and use the frames to attach the multilayers together into a completed chamber.

Advanced Search
Powered by Gallery v2.3